Construction Daily Report

A construction daily report for superintendents and site managers: weather morning and afternoon with temperatures, wind and precipitation, manpower by company and trade with headcount and hours, equipment on site and its hours, work completed by area with photos, deliveries with ticket numbers, inspections and their results, visitors, delays and lost hours with their cause, directions, field orders and extra work, safety talks, hazards and incidents, tomorrow's plan, and the superintendent's signature.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

On a day with a concrete placement, the daily report notes that it happened. The truck-by-truck record of the pour itself belongs in: Daily concrete pour log

0 of 49 answered0%
1

Project and Day

Which job, which day, and who is writing it up.

Tell me what you seeSign in to talk instead of typing.

Number the reports in sequence so a missing day is obvious.

2

Weather and Ground

What the sky and the ground did, morning and afternoon.

Tell me what you seeSign in to talk instead of typing.
°F
°F
mph
in
in
3

Manpower

Every crew on site — your own and each sub — with headcount and hours.

Tell me what you seeSign in to talk instead of typing.
Crews on site

Nothing added yet.

4

Equipment

What machinery was on site, how much it ran, and what broke.

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions about it fold away.

5

Work Completed

What got built today, area by area, with photos.

Tell me what you seeSign in to talk instead of typing.
Work by area

Nothing added yet.

Crews expected, deliveries due, inspections booked, anything that has to be ready.

6

Deliveries and Materials

What arrived, what was short or damaged, and what never came.

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions about it fold away.

7

Inspections and Visitors

Who came to check the work, what they found, and who else was on site.

Tell me what you seeSign in to talk instead of typing.

Building department, special inspections, owner's QA, testing agency, your own quality checks.

Owner, architect, engineer, inspectors not listed above, safety officers, salespeople.

8

Delays and Issues

What slowed or stopped the work, why, and what it cost in time.

Tell me what you seeSign in to talk instead of typing.
9

Directions, Changes and Extra Work

Anything said or done today that could change the contract.

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions about it fold away.

Answer No and the questions about it fold away.

Answer No and the questions about it fold away.

Answer No and the questions about it fold away.

10

Safety

The day's safety talk and walk, what was seen, and anything that went wrong.

Tell me what you seeSign in to talk instead of typing.
11

Photos, Notes and Sign-off

Anything the sections above missed, and your signature.

Tell me what you seeSign in to talk instead of typing.

Wide shots from the same spots each day make progress easy to follow.

0/10 · they go into your PDF and stay on this computer

Sign above — Superintendent
Sign above — Project manager

Free, no account needed. Your answers never leave this browser.

A construction daily report is the superintendent's written account of one day on the job: what the weather did, who showed up and for how long, what equipment ran, what got built and where, what was delivered, who inspected or visited, what held the work up, and whether anyone was hurt. On a good day it takes ten minutes. On a bad day it is the most valuable document on the project, because it was written that evening, before anyone knew there would be a dispute. This template follows the order you think back through the day and lifts lost time, injuries, failed inspections and unauthorized extra work into a summary at the top of the report. Fill it in here and download a PDF, or speak while you walk, and the document writes itself.

Why the daily report matters more than it seems

Most days the report goes into a folder and nobody reads it. Then, six months later, there is a delay claim, a backcharge argument or an injury case, and every party reaches for the daily reports to find out what really happened on a particular Tuesday. A report written the same day, with headcounts, hours and photos, is hard to argue with. A report written a week later from memory is easy to pick apart.

That is why this form asks for numbers where numbers exist — workers, hours, temperatures, inches of rain, hours lost — and for photos tied to each area of work. Opinions belong in the notes; facts belong in the fields.

Manpower and equipment, line by line

Each crew on site gets one line: the company, the trade, how many people, how many hours, and where they worked. Your own forces and every subcontractor go in the same list, so the day's total is simple to add up and easy to compare with the schedule. If a sub was scheduled and did not come, that goes under delays, with the hours it cost.

Equipment works the same way. Record what was on site, whether it is owned or rented, how many hours it ran, and whether it sat idle or broke down. Idle rented equipment is money, and a broken excavator on the critical path is a delay with a cause.

Delays, directions and extra work

The questions that protect the contract are grouped together. Was work delayed or stopped, and why, and for how long? Did the owner, architect or engineer tell anyone to do something differently, and is it in writing yet? Did you give a sub a direction that might cost them money? Was extra work done, was it authorized, and should someone else pay for it?

Each starts as a single yes or no, so a quiet day takes seconds. A yes opens the details. Verbal instructions not yet confirmed in writing and extra work done without written authority are flagged, because those are the items that turn into arguments later.

Safety on the daily report

The daily report is not the incident report, but it is where an incident is first written down. The form records the toolbox talk and its topic, whether a site safety walk was done, hazards seen and whether they were corrected, and any injury, near miss or property damage. Anything in that last group appears in the summary of findings and reminds you to complete a full incident report.

Common questions

Who fills out the construction daily report?

Usually the general contractor's superintendent or site manager, at the end of each working day. On larger jobs an assistant superintendent or field engineer may draft it, but the superintendent reviews and signs it.

What should a construction daily report include?

At minimum: date, weather, manpower by company and trade with hours, equipment, work performed and where, deliveries, inspections and visitors, delays and their cause, directions or changes received, safety observations and incidents, and photos. This template covers all of them, plus tomorrow's plan.

Is a daily report the same as a daily log or site diary?

In practice, yes. Contracts and companies use daily report, daily log, field report and site diary for the same record. What matters is that it is written every working day and kept with the project records.

Should I write a report on days nobody worked?

Yes, briefly. A report saying the site was shut because of rain, or that a sub failed to show, is evidence for a time extension. A gap in the reports is evidence of nothing.

Does the form score the day?

No. A daily report is a record, not a pass mark. Answers that are problems — lost hours, a stop order, an injury or near miss, a failed inspection, damaged deliveries, broken-down equipment, unauthorized extra work — are listed in the summary of findings at the top of the report.