Construction Site Audit (UK)

A UK construction site health and safety audit: CDM duties and paperwork, site set-up and security, inductions and cards, welfare, access and traffic, work at height, excavations and temporary works, plant and lifting, electrics, fire and first aid, COSHH and occupational health, housekeeping and environment, PPE, RAMS and permits — with demolition, asbestos, confined spaces and work near water switched on only where they apply. Scored, with an overall Red/Amber/Green rating and a corrective action list.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

This audit is written for UK sites and UK regulations. Auditing a project anywhere else, or want a shorter walk that checks the paperwork against the site? That has its own page: Construction site inspection

0 of 137 answered0%
1

Audit Details

Which project, at what stage, and who walked it.

Tell me what you seeSign in to talk instead of typing.
2

Management and CDM Duties

The arrangements behind the site: plan, duty holders, notices and records.

Tell me what you seeSign in to talk instead of typing.

Answer N/A if this is the first audit of the project.

Notifiable: over 30 working days with more than 20 people on site at once, or over 500 person-days. Otherwise N/A.

3

Site Set-Up and Security

The boundary, the entrance and what is on the notice board.

Tell me what you seeSign in to talk instead of typing.

0/4 · they go into your PDF and stay on this computer

4

Inductions, Cards and Consultation

Is everyone on site briefed, qualified for their work and listened to?

Tell me what you seeSign in to talk instead of typing.
5

Welfare

Toilets, washing, drinking water, somewhere to eat and somewhere to change.

Tell me what you seeSign in to talk instead of typing.

Answer N/A where the work does not call for them.

0/4 · they go into your PDF and stay on this computer

6

Access, Egress and Traffic

How people and vehicles get in, move about and get out.

Tell me what you seeSign in to talk instead of typing.

0/4 · they go into your PDF and stay on this computer

7

Work at Height

Scaffolds, towers, MEWPs, ladders, edges and fragile surfaces.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole topic folds away and is left out of the score.

8

Excavations and Temporary Works

Digging, and anything holding something else up while it is built.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole topic folds away and is left out of the score.

9

Plant, Lifting and Equipment

Machines, lifts and the tools in people's hands.

Tell me what you seeSign in to talk instead of typing.

Commonly every 6 months for accessories and equipment that lifts people, every 12 months for other lifting equipment.

Answer N/A if none are in use.

0/6 · they go into your PDF and stay on this computer

10

Electricity and Services

Temporary supplies, tools and leads, and live services in the ground or overhead.

Tell me what you seeSign in to talk instead of typing.

Answer N/A if there are none.

11

Fire, First Aid and Emergency

If something goes wrong today, what happens?

Tell me what you seeSign in to talk instead of typing.

Typically to LPS 1207 or equivalent.

0/4 · they go into your PDF and stay on this computer

12

COSHH and Occupational Health

Substances, dust, noise, vibration and lifting.

Tell me what you seeSign in to talk instead of typing.

Answer N/A if there are none.

13

Housekeeping, Waste and Environment

A tidy site, waste handled properly, and the neighbours protected.

Tell me what you seeSign in to talk instead of typing.

Answer N/A if none are on or next to the site.

0/4 · they go into your PDF and stay on this computer

14

Personal Protective Equipment

The last line of protection, worn and fit for the job.

Tell me what you seeSign in to talk instead of typing.

Answer N/A if none are used.

15

RAMS and Permits

The written plan for each activity, and whether the work matches it.

Tell me what you seeSign in to talk instead of typing.
16

Specialist Activities

Demolition, asbestos, confined spaces and work near water — only where they are happening.

Tell me what you seeSign in to talk instead of typing.

Answer No and these questions fold away and are left out of the score.

Answer No and these questions fold away and are left out of the score.

Answer No and these questions fold away and are left out of the score.

Answer No and these questions fold away and are left out of the score.

0/6 · they go into your PDF and stay on this computer

17

Findings and Sign-Off

What was put right on the spot, what still needs doing, and who agreed.

Tell me what you seeSign in to talk instead of typing.

Your judgement, separate from the score. One uncontrolled serious risk is enough for Red.

Corrective actions

Nothing added yet.

0/10 · they go into your PDF and stay on this computer

Sign above — Auditor
Sign above — Site manager

Free, no account needed. Your answers never leave this browser.

A construction site audit is a structured look at how well a UK site is managing health and safety — not only what is on the ground today, but whether the arrangements behind it are working: the construction phase plan, inductions, RAMS, permits, inspections and registers. This one is written around CDM 2015 and the regulations that sit beside it, covers the topics that matter on most sites in the order you would walk them, and switches the rarer activities on only when they are happening. It records what was found; it does not certify a site as compliant. You can fill it in here and download a finished PDF without creating an account.

Audit or inspection?

A site inspection looks at conditions — is that scaffold boarded, is that excavation fenced. An audit also asks whether the system that should have caught the problem is working: was the scaffold inspected and recorded, was the excavation covered by a permit to dig, were the people doing the work briefed on the method statement. A site can look tidy on the day and still fail an audit because nothing behind it would keep it that way.

That is why each topic here mixes the two: a few questions about the paperwork and the people, then what you can see. Where the two disagree — a register that says the scaffold was inspected yesterday and a scaffold with missing toe boards — write it down. That gap is usually the most useful finding of the day.

CDM 2015 in one paragraph

The Construction (Design and Management) Regulations 2015 apply to all construction work in Great Britain. Where more than one contractor is involved, the client must appoint a principal designer and a principal contractor, and the principal contractor must draw up a construction phase plan before work starts. Projects lasting more than 30 working days with more than 20 workers on site at once, or exceeding 500 person-days, must be notified to HSE on an F10, and the notification displayed on site. Every contractor must provide welfare, inductions and supervision appropriate to the work. The first section of this audit checks those duties; the rest checks whether they are doing their job.

Topics that switch on and off

Work at height, excavations and the specialist activities each start with one question. Answer No and the whole topic folds away and drops out of the score, so a fit-out site is not marked down for having no trenches. Demolition, asbestos removal, confined spaces and work on or near water are grouped together near the end, because on most sites they are either absent or the most dangerous thing happening that week.

Scoring and the Red/Amber/Green rating

The score is the share of checks answered Yes out of everything that applied. It is useful for trends — the same site month on month, or comparing sites in a programme — but it is not a verdict. A site can score 90% and still have someone working at an unprotected edge.

So the audit ends with your own Red/Amber/Green rating, separate from the score, and a list of corrective actions with an owner and a date. A Red rating appears at the top of the report's summary of findings. On the phone, Start a re-inspection turns every failed check into its own card for the follow-up visit, and the follow-up report puts each one beside what you found the first time. Speak while you walk, and the document writes itself.

Common questions

What does a construction site audit cover?

Management arrangements and CDM duties, site set-up, inductions and competence, welfare, access and traffic, work at height, excavations and temporary works, plant and lifting, electrical safety, fire and first aid, COSHH and occupational health, housekeeping and environment, PPE, and risk assessments, method statements and permits.

How often should a construction site be audited?

There is no single legal frequency. Many principal contractors audit each site monthly, with weekly inspections by the site manager in between, and more often during high-risk phases such as demolition, groundworks or the frame.

Does completing this audit make a site CDM compliant?

No. It records what the auditor found on the day against the main duties. Compliance is a matter for the duty holders and, ultimately, HSE. Treat the audit as evidence of checking, and the corrective actions as the work.

Who should carry out the audit?

Someone competent in construction health and safety who is independent of the day-to-day running of the site — a company safety adviser, a contracts manager from another project, or an external consultant. The site manager should walk round with them.

Can I use this outside the UK?

The topics travel well, but the questions name UK regulations and documents such as the F10, LOLER and CSCS cards. For a site elsewhere, the general construction site inspection page is a better fit.

Can the next audit start from this one?

Yes. In the ReportWalk app, a re-inspection brings back only the checks that failed, each with fixed, partly fixed or not fixed and an after photo, and puts what is still outstanding first. Re-inspections are free.