Free for life: Get a Quote and Book Online buttons for your website. Create my widgets →Need a website? $25/mo or $500 once →
ReportWalk

Construction

Crane Inspection

A job-site inspection of a mobile crane and the lift around it: certificates and people, ground and outrigger set-up, rigging up or down, the exclusion zone, overhead power lines, a walk-round of the machine, rigging and the load, and lifting people — ending in a go, go with conditions, or stop.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

0 of 78 answered0%
1

Lift and Crane Details

Which job, which crane, what is being lifted, and who checked.

Tell me what you seeSign in to talk instead of typing.

Gridline, road, or a sketch reference from the lift plan.

Compare it with the limit in the crane's figures for this configuration — and remember large flat loads catch far more wind.

km/h
2

Documents and People

The paper that says this crane and these people can do this lift.

Tell me what you seeSign in to talk instead of typing.

In the UK, LOLER thorough examination at least every twelve months; in the US, the annual inspection under Subpart CC. Check the date, not just that a certificate exists.

3

Ground and Set-Up

What the crane is standing on, and how it is standing on it.

Tell me what you seeSign in to talk instead of typing.

Ask where the drains, basements and backfilled trenches are. Nobody can see them from the surface.

0/6 · they go into your PDF and stay on this computer

4

Rigging Up or Down

Only when the crane is being assembled or dismantled on site.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

5

Exclusion Zone and Surroundings

Who could be hit, and what else is in the airspace.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

Answer No and this whole section folds away. It is not counted in the score.

0/4 · they go into your PDF and stay on this computer

6

Overhead Power Lines

If any part of the crane, load or rigging could come near a line.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

7

The Crane

A walk-round of the machine with the operator.

Tell me what you seeSign in to talk instead of typing.

Ask the operator to show you the set-up screen. A limiter set for the wrong configuration is worse than none.

0/4 · they go into your PDF and stay on this computer

8

Rigging and the Load

What connects the hook to the load, and what the load really weighs.

Tell me what you seeSign in to talk instead of typing.

At wider sling angles each leg carries more than half the load. The plan should show the angle.

9

Lifting People

Only if a crane-suspended basket or platform will carry people.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

10

Decision and Sign-Off

Lift, lift with conditions, or stop — and who agreed.

Tell me what you seeSign in to talk instead of typing.
Corrective actions

Nothing added yet.

0/10 · they go into your PDF and stay on this computer

Sign above — Lift supervisor
Sign above — Crane operator
Sign above — Site manager

Free, no account needed. Your answers never leave this browser.

A crane inspection on a job site is the check, before lifting starts, that a mobile crane is sound, properly set up on ground that will hold it, rigged correctly, and working inside a plan with the right people in the right places. This form follows the order a lift actually happens in, switches off the sections that do not apply today, and ends in a clear decision to lift, lift with conditions, or stop. You can fill it in here and download the record as a PDF without creating an account.

The crane is the easy part

Mobile crane accidents are rarely caused by a crane that was mechanically unsound on the day. They come from the ground giving way under an outrigger, a boom touching an overhead line, a load heavier than anyone thought, rigging used at an angle that doubled the tension, or someone standing where they should not have been.

That is why the machine itself is the seventh section of this form, not the first. Ground, set-up, the exclusion zone and the power lines come before it, because they are where lifts go wrong.

Ground, outriggers and mats

An outrigger puts a large share of the crane and its load onto a very small area. Whether the ground holds depends on what is under it — fill, a recent trench, a buried drain, a basement edge, soft ground after rain — and nobody can see that from the surface.

Outrigger mats spread the load. Their size should be worked out from the outrigger load the crane's figures give for the lift and the bearing capacity of the ground, not chosen by eye. The form asks for the ground to have been assessed and the mats sized, then checks that the outriggers are fully deployed as the load chart requires and that the crane is level.

Overhead power lines

If any part of the crane, the load or the rigging could come within the minimum clearance of an overhead line, that section of the form opens. It records the voltage, the distance, who confirmed the voltage, and which controls are in place.

Clearances are set locally. In the US the Subpart CC default for lines up to 350 kV is 20 feet, with more for higher voltages; in the UK the network operator advises and HSE guidance applies. Treat every line as live until its owner confirms in writing that it is not.

Regulations, as context only

In the US, cranes in construction fall under OSHA 1926 Subpart CC, which covers assembly, ground conditions, power lines, operator certification, signal persons and inspections. In the UK, LOLER sets the thorough examination regime and BS 7121 is the code of practice for safe use; Australia and other countries have their own. This form is built around the topics those regimes have in common. It does not certify compliance with any of them, and your lift plan and the appointed or qualified person on your job decide what applies.

Common questions

How often should a mobile crane be inspected?

There are usually several layers: a pre-use check by the operator each shift, a site inspection like this one before lifting starts or when conditions change, frequent or monthly inspections by a competent person, and a thorough examination or annual inspection by a qualified examiner. The intervals differ by country — your crane supplier and your local rules set them.

Who should carry out a crane inspection on site?

Someone competent in lifting operations — often the lift supervisor, appointed person, or a site manager with lifting training — working with the crane operator. The operator knows the machine; the site knows the ground, the services and the people.

What is a lift plan?

A written plan for a lift or a series of lifts: the load weight and dimensions, the crane and its configuration, the radius, the rigging, the ground and mat details, the exclusion zone, communication, and who does what. Complex or critical lifts need a more detailed one. The form asks whether there is a plan and whether it matches what is in front of you.

What is the difference between a signaller and a slinger?

The slinger or rigger attaches and detaches the load and chooses the rigging. The signaller — banksman or signal person — directs the operator when the operator cannot see the load or the landing area. One person can do both if trained for both, but there must be one clearly identified signaller at any moment.

Can a crane lift people?

Only in limited circumstances, in a basket designed and rated for it, when no safer method such as a MEWP or scaffold is practical, and under a specific plan with trial lifts and extra checks. The form has a gated section for it; if it applies, your local rules on personnel platforms will set more requirements than the form shows.