Crane Tree Removal Plan

A crane-assisted tree removal plan and pre-lift checklist: the crane operator, signal person, rigger, climber and rescuer and their qualifications, the crane's route in, ground conditions and outrigger pads, power lines, the swing and landing zones, typed weight estimates for each piece against the chart capacity the operator gives you, slings, hook and pick points, the climber's tie-in separate from the crane line, signals and the stop call, the exclusion zone, the pre-lift meeting and the test pick, with findings and sign-off by the job leader and the operator.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

When there is room to drop the tree whole instead, the plan for that is: Tree felling plan

0 of 57 answered0%
1

Job Details

The job, the crane and who prepared the plan.

Tell me what you seeSign in to talk instead of typing.

This records the tree crew's plan and the checks before lifting. The crane operator remains responsible for the crane, its set-up and its capacity.

0/6 · they go into your PDF and stay on this computer

2

People and Qualifications

Who does each job, and whether they are qualified for it.

Tell me what you seeSign in to talk instead of typing.

As your contract, state and federal rules require. Note the card or license in the comment if useful.

Who goes up, by what route, and whether the crane is used or kept out of the way.

3

Crane Route and Set-Up

Getting the crane in, standing it up and keeping people clear of it.

Tell me what you seeSign in to talk instead of typing.

Driveways, curbs, bridges, overhanging limbs and wires on the way in.

Septic tanks and drain fields, cisterns, irrigation, utilities and recently filled ground.

Clear of people and vehicles, with bearers or old tires if pieces must be landed gently.

0/6 · they go into your PDF and stay on this computer

4

Load Planning

How heavy each piece is likely to be, set against the figure from the operator.

Tell me what you seeSign in to talk instead of typing.

From the crane's center of rotation to the pick, as the operator measures it.

ft

Typed as the operator gives it, with rigging deductions as the operator applies them. This form does not check it.

lb
lb

Green wood is easy to underestimate. Many crews plan pieces at a fraction of chart capacity and confirm on the test pick.

Planned picks

Nothing added yet.

5

Rigging and Tie-In

How each piece is attached and how the climber stays safe while cutting it.

Tell me what you seeSign in to talk instead of typing.

Above the balance point, or with a second sling where a piece must stay level.

Tied in to a sound part of the tree or another anchor, never to the piece being cut and never to the hook or load line.

Answer Yes only if a person will ride a personnel platform or the hook. If No, the check below folds away.

6

Signals and Exclusion Zone

How the climber, the signal person and the operator talk, and who is kept out.

Tell me what you seeSign in to talk instead of typing.

Signs, cones, a flagger or a road permit as the site needs.

7

Pre-Lift Meeting and Test Pick

The last checks before the first piece goes up.

Tell me what you seeSign in to talk instead of typing.

Plan, order of picks, signals, stop call, exclusion zone and rescue plan.

Estimate against the load indicator, how the rigging behaved, whether signals worked.

0/8 · they go into your PDF and stay on this computer

8

Findings and Sign-Off

Anything to fix before lifting or afterward, and the signatures.

Tell me what you seeSign in to talk instead of typing.
Findings and actions

Nothing added yet.

Sign above — Arborist in charge
Sign above — Crane operator

Free, no account needed. Your answers never leave this browser.

A crane tree removal plan is the agreement between the tree crew and the crane crew before the first piece is picked: who is in charge of what, where the crane sets up, how heavy each piece is likely to be, how it is rigged, how the climber stays tied in, and how everyone talks. Crane removals let crews take out trees over houses and pools that could not be lowered or felled, but they combine two kinds of risk, a heavy machine near a weakened tree and a climber working under a suspended load. This template records the plan and the checks before lifting, turns every gap into a finding, and gets the job leader and the operator to sign. Fill it in here and download a PDF without an account, or speak while you walk, and the document writes itself.

Two crews, one plan

On a crane removal the crane operator is responsible for the crane: its set-up, its chart and whether a pick is within it. The arborist is responsible for the tree: how pieces are cut, how heavy they are likely to be and how they will behave when cut free. Most crane removal accidents happen in the gap between the two, when a piece is heavier than the climber guessed, or is cut before the crane has taken its weight.

This form puts both sides on one page. The operator supplies the chart capacity at the working radius; the tree crew supplies the weight estimates and the cutting plan. The form records both as typed numbers and never calculates or approves a lift.

Setting up the crane

Before the crane arrives, check the route in for width, overhead clearance, weight limits on driveways and bridges, and anything buried: septic tanks, drain fields, irrigation and utilities. At the setup, the ground under each outrigger needs to carry the load, usually on pads or cribbing sized for the soil. The swing of the counterweight and the area where pieces will be landed need room and a barricade.

If any line is within reach of the boom, load line or a swinging piece, the plan records the approach distance the crew will keep as your qualification, state and utility rules require, and who is qualified to work near them.

Weights, rigging and the climber's tie-in

Each planned piece gets a typed weight estimate and the method behind it: a species weight table, a volume calculation, or the crane's load indicator during the test pick. Keep estimates well inside the chart figure the operator gives you; green wood is easy to underestimate. Slings and shackles must be rated and inspected, the hook latched, and pick points chosen so the piece hangs the way you expect once it is cut.

The climber stays tied in to the tree or another sound anchor on a line that is separate from the crane's load line, and never to the piece being cut. The piece is cut only once the operator has taken the planned tension and confirmed it.

The pre-lift meeting and the test pick

Before the first piece, everyone involved meets: the plan, the order of picks, the signals, the stop call, the exclusion zone and the rescue plan. The first pick is a small one, a test of weight estimates, rigging and communication. If the crane's load indicator shows more than the estimate, every later estimate gets revisited before the next cut.

Common questions

Who is in charge on a crane tree removal?

The crane operator has the final say on the crane and whether a pick is within its capacity. The arborist in charge plans the tree work, the cuts and the weight estimates. Agree before starting who calls the picks and remember that anyone can call a stop.

Does the crane operator need to be certified?

Operator certification or qualification is required in many situations under OSHA rules, and some states and cities add their own licensing; crane providers and insurers usually expect it too. Record the operator's certification as your contract and the rules that apply to your work require; this form records it but does not verify it.

How do we estimate the weight of a piece of tree?

Measure or estimate the length and diameter, work out the volume, and multiply by a green weight for the species from a published table, adding for limbs and leaves. Many crews then confirm with the crane's load indicator on a small test pick. The form records the estimate and the method; it does not do the calculation.

Why must the climber's tie-in be separate from the crane line?

If the piece the climber is attached to moves unexpectedly, or the crane has to swing or drop, a climber tied to that piece or to the load line goes with it. An independent tie-in to a sound part of the tree keeps the climber where they are.

Is this a full lift plan?

It records the arborist's side of the plan and the pre-lift checks. The crane provider may have its own lift plan or critical lift procedure, especially for picks near capacity or near lines; attach it and follow it.