Fibre Scoping Form

A fibre scoping form for the site survey before an install is quoted: customer and service, permissions and wayleave, the network point and distances, the external route by duct, new dig, overhead or surface, the entry point and wall, an asbestos check for pre-2000 buildings, the internal route and fire-stopping, the termination point and power, hazards, and the assumptions and exclusions the quote rests on.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

Found materials on the route that might contain asbestos and need to record them properly before anyone drills? That has its own page: Asbestos inspection report

0 of 65 answered0%
1

Customer and Service

Who ordered what, at which address, and what kind of building it is.

Tell me what you seeSign in to talk instead of typing.

Before 2000, or not known, switches on the asbestos questions.

2

Permissions and Wayleave

Who has to say yes before any work starts.

Tell me what you seeSign in to talk instead of typing.

Anything fixed to a listed building, or to the front of one in a conservation area, may need consent first.

3

Network Point and Distance

Where the fibre comes from, and how far it has to travel.

Tell me what you seeSign in to talk instead of typing.
m
m
m

0/4 · they go into your PDF and stay on this computer

4

External Route

How the cable gets from the boundary to the wall.

Tell me what you seeSign in to talk instead of typing.

0/6 · they go into your PDF and stay on this computer

5

Entry Point and Wall

Where the cable comes through, and what it goes through.

Tell me what you seeSign in to talk instead of typing.
mm

Check inside before you drill from outside. A hidden cable or pipe is the most common drilling accident.

0/4 · they go into your PDF and stay on this computer

6

Internal Route and Fire-Stopping

From the inside of the wall to where the equipment goes.

Tell me what you seeSign in to talk instead of typing.
m

Between flats, from a garage into the house, into a communal riser or between floors in a block. Each hole must be sealed to the same standard.

0/5 · they go into your PDF and stay on this computer

7

Termination Point and Power

Where the fibre ends and the equipment lives.

Tell me what you seeSign in to talk instead of typing.

These may stop working when the line moves to fibre. Tell the customer to check with their alarm provider before install day.

0/3 · they go into your PDF and stay on this computer

8

Hazards

Anything the install crew needs to know before they arrive.

Tell me what you seeSign in to talk instead of typing.
9

Work Type, Assumptions and Exclusions

What the quote is for, what it assumes, and what it leaves out.

Tell me what you seeSign in to talk instead of typing.
To clear before booking the install

Nothing added yet.

10

Agreement and Sign-Off

The customer agrees the route; the surveyor signs the survey.

Tell me what you seeSign in to talk instead of typing.

0/10 · they go into your PDF and stay on this computer

Sign above — Surveyor

Free, no account needed. Your answers never leave this browser.

A fibre scoping form is the survey a contractor or installer completes before quoting a fibre broadband install: where the network comes from, how far it is to the building, how the cable will cross the property and get through the wall, where the equipment will sit inside, whose permission is needed, and what could stop or slow the job. It is written in British English for homes and small businesses, and you can fill it in here and download a finished PDF without creating an account.

Why scope before you quote

Most fibre installs are straightforward: an existing duct from the footway to the house, a short drill through the wall, a box by the router. The ones that go wrong are the ones nobody looked at properly first — a duct collapsed under the drive, a listed building, a shared path over somebody else's land, a ceiling that turns out to be textured coating in a 1970s flat.

A scoping visit finds those before a crew is booked. It turns into a quote that says what is included, what is assumed and what is not, and a job sheet the install team can follow without ringing the surveyor.

Permissions come before the spade

The person who ordered the service is not always the person who can say yes to the work. A tenant needs the landlord's consent to drill an outside wall; a flat in a block needs the freeholder or managing agent; a route over a neighbour's drive or a private road needs the landowner, and sometimes a formal wayleave. Listed buildings and conservation areas may need consent for anything fixed to the front.

The form records who owns what, which permissions are in hand and which are still outstanding, and the quote should not be booked in until the outstanding ones are cleared.

Asbestos in buildings built before 2000

In the UK, asbestos was used in buildings until it was banned in 1999, so any building built or refurbished before 2000 may contain it — in textured ceiling coatings, soffits, wall panels, floor tiles and old cable ducts. Drilling or cutting into it releases fibres.

If the building is that old, or nobody knows, the form asks whether there is an asbestos register, whether anything suspect sits on the route or at a drill point, and what you will do about it: carry on, re-route, have it sampled, or stop. When in doubt, do not drill — treat the material as if it contains asbestos until a test says otherwise.

Fire-stopping and the inside route

Every hole made through a wall or floor that separates fire compartments — between flats, from a garage into the house, into a communal riser — has to be sealed again to the same standard. It is easy to forget on a small cable and it matters most in blocks of flats.

The form asks whether the inside route crosses a fire-separating wall or floor and how each penetration will be sealed, so the installer arrives with the right product and the job is not signed off with an open hole.

Speak while you walk, and the document writes itself — describe the route as you follow it from the footway to the socket, and the survey fills in behind you.

Common questions

What is a fibre scoping form?

A site survey record completed before a fibre broadband install is quoted. It records the network connection point, distances, the external and internal cable route, the entry point, where the equipment goes, the permissions needed, the hazards, and what the quote does and does not include.

Who needs to give permission for a fibre install?

The property owner, if the customer is a tenant; the freeholder or managing agent for a flat in a block; and the owner of any third-party land the route crosses, such as a shared drive or private road, sometimes through a formal wayleave. Listed buildings and conservation areas may need consent from the local planning authority.

Do I need to check for asbestos before drilling for fibre?

In any building built or refurbished before 2000, yes — check whether there is an asbestos register and look at the materials on the route and at each drill point. If anything is suspect, re-route, have it sampled, or stop and refer the job, rather than drilling into it.

What is usually excluded from a fibre installation quote?

Commonly: reinstatement beyond backfilling and a basic surface finish, redecorating, moving furniture, work on third-party land without permission, asbestos surveys or removal, and new electrical sockets. The form lets you tick the exclusions that apply and add your own.

Does the customer need to sign the survey?

It is good practice. A signature confirms the customer agreed the route, the entry point and where the equipment will go, which avoids arguments on install day. It does not replace the contract or terms the service is sold under.