A visual fire sprinkler inspection for facility managers and building owners, set by frequency — weekly, monthly, quarterly or annual: control valves (open, sealed or locked, supervised), gauge readings, obstructions, a list of problem heads with photos, the spare head cabinet and wrench, the fire department connection, alarm devices, signs, piping, impairments and deficiencies. It does not replace the licensed contractor's inspection report.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

Checking the extinguishers on the same round? Use: Monthly fire extinguisher inspection — one entry per unit

0 of 36 answered0%
1

Building and Check

Which building, which interval this check covers, and who to call.

Tell me what you seeSign in to talk instead of typing.

The whole building, or the risers, floors or wings walked today.

Quarterly adds alarm devices, the fire department connection and design signs. Annual adds piping, hangers and the spare head cabinet.

Visual check by the owner's representative. Do not operate valves, flow water or trip alarms — that is the licensed contractor's work, and their NFPA 25 inspection report is not replaced by this form.

2

Control Valves

Every valve that can shut water off to sprinklers: open, and kept that way.

Tell me what you seeSign in to talk instead of typing.
Control valves*

Nothing added yet.

3

Gauges and Freeze Protection

Readings on every gauge, compared with last time, and heat where water could freeze.

Tell me what you seeSign in to talk instead of typing.
Gauges read

Nothing added yet.

Answer N/A outside the cold season. Frozen pipes split and leave the system impaired.

0/4 · they go into your PDF and stay on this computer

4

Sprinkler Heads and Obstructions

Look up, room by room, from the floor. List only the heads with a problem.

Tell me what you seeSign in to talk instead of typing.

Do not touch, clean or paint any head. Painted, corroded or loaded heads are replaced by the contractor.

Some storage occupancies and special heads need more. Ask your contractor what applies.

A missing tile lets heat escape past the head and slows its response.

Heads with a problem

Nothing added yet.

5

Impairments

Any part of the system out of service, and how the building is covered meanwhile.

Tell me what you seeSign in to talk instead of typing.

Answer No and this section folds away. It is not counted in the score.

6

Not Checked

What you could not see or reach today, and why.

Tell me what you seeSign in to talk instead of typing.
7

Deficiencies and Sign-Off

What has to be fixed, by whom, and by when.

Tell me what you seeSign in to talk instead of typing.
Deficiencies and actions

Nothing added yet.

0/10 · they go into your PDF and stay on this computer

Sign above — Checked by

Free, no account needed. Your answers never leave this browser.

A fire sprinkler inspection checklist is the record of the visual checks a building owner or facility manager makes between visits from the sprinkler contractor: valves open and secured, gauges reading normally, nothing stacked into the spray, heads clean and undamaged, the fire department connection usable, and any impairment handled. Pick the frequency at the top and the form asks what belongs to that interval. You can fill it in here and download a finished PDF without creating an account.

Your check and the contractor's report are different documents

In the US, sprinkler systems are inspected, tested and maintained to the NFPA 25 standard, usually as adopted by the local fire code. Much of the testing — flowing water through the inspector's test, tripping a dry valve, testing alarms, checking the fire pump — is done by a licensed contractor, who issues the formal report the fire marshal and the insurer ask for.

The visual checks in between are commonly the owner's job, and they are where most problems are actually found first: a closed valve after a tenant fit-out, a gauge that has dropped, boxes stacked to the ceiling. This form records those checks. It does not replace the contractor's report, and it never asks you to operate a valve or flow water.

Which checks belong to which interval

The rhythm most owners follow looks like this — your contractor and your local fire code have the final word:

  • Weekly or monthly: control valves open and sealed, locked or supervised; gauges on dry, pre-action and deluge systems (weekly) and wet systems (monthly); freeze protection in cold weather.
  • Quarterly: water-flow and supervisory alarm devices, the fire department connection, and the hydraulic design sign on each riser.
  • Annually: sprinkler heads from the floor, pipe and hangers, the spare head cabinet and wrench, and clearance below the heads.

The closed valve is the failure that matters

A sprinkler system with a closed control valve looks exactly like a working one until the day it is needed. Valves get shut for a fit-out, a leak or a contractor's visit, and nobody opens them again. That is why the valve check comes first, every time, and why an unsecured valve — no seal, no lock, no tamper switch — is a finding even if it is open today.

Heads: list the problems, not the whole building

A building can have thousands of heads, and a line for each one tells the reader nothing. Look from the floor, room by room, and add an entry only for a head that is painted, corroded, loaded with dust or grease, obstructed, damaged, leaking, or missing its escutcheon. A clean building ends with an empty list and a sentence saying the survey was done.

Do not touch, clean or paint a sprinkler head. Painted and corroded heads are replaced, not cleaned, and that is contractor work.

Common questions

Who is allowed to do a fire sprinkler inspection?

Visual checks between contractor visits are often done by the owner's staff — a facility manager, maintenance tech or building engineer. Testing and maintenance are done by a qualified, usually licensed, contractor, and many jurisdictions require the annual inspection to be performed and reported by one. Check your local fire code.

How often do fire sprinklers need to be inspected?

Different parts on different intervals: control valves weekly or monthly, gauges weekly or monthly depending on the system type, alarm devices and the fire department connection quarterly, and heads, piping and spare heads annually. Your contractor and local fire code set the exact schedule.

How much clearance is needed below sprinkler heads?

Commonly 18 inches below the deflector for standard heads, and more for some storage occupancies and special heads. Storage that creeps up into that space blocks the spray pattern. If in doubt, ask your contractor what applies to your system.

What should I do if a sprinkler valve is found closed?

Treat the system as impaired. Find out why it was closed before opening it — there may be a leak or work in progress — and follow your impairment procedure: notify the monitoring company, the fire department and the insurer as your rules require, and arrange a fire watch until the system is restored.

Can I paint over a sprinkler head or clean a dusty one?

No. Paint and corrosion change how a head responds to heat, and cleaning can damage it. Heads that are painted, corroded or heavily loaded are replaced by the contractor with matching heads from the spare cabinet.