Framing Inspection Checklist

A framing inspection checklist for the walk before sheathing or drywall: layout and openings against the plans, walls plumb and straight, headers, bracing and tie-downs, floor framing, trusses and rafters, holes, notches and fireblocking for the services, and site housekeeping. Each check is Pass, Fail or N/A with a note on every fail, and the walk ends in a ready-to-cover decision.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

0 of 91 answered0%
1

Inspection Details

Which house, which stage, and what you are checking it against.

Tell me what you seeSign in to talk instead of typing.

Most framing defects that matter can only be seen against these drawings.

2

Layout and Setout

Is the frame where the plans say it should be?

Tell me what you seeSign in to talk instead of typing.

Measure the key dimensions — a common allowance is about 3/8 in (10 mm), unless the plans say tighter.

Measure both diagonals of each main room; they should match within your tolerance.

0/4 · they go into your PDF and stay on this computer

3

Walls and Plates

Plumb, straight, fixed down, and carrying the loads they should.

Tell me what you seeSign in to talk instead of typing.

A common allowance is about 1/4 in over 8 ft (6 mm over 2.4 m). Tiled and cabinet walls often need better.

A common US pattern is 1/2 in bolts at 6 ft centers and within 12 in of each plate end — the plans govern.

Follow each point load to the foundation. A missing post under a girder is one of the most serious framing defects.

0/6 · they go into your PDF and stay on this computer

4

Headers and Openings

Every opening carried properly, and every window ready for the weather.

Tell me what you seeSign in to talk instead of typing.

Check engineered headers against the label and the schedule, not by eye.

0/4 · they go into your PDF and stay on this computer

5

Bracing and Tie-Downs

What stops the house racking, lifting or sliding. Check against the engineer's details.

Tell me what you seeSign in to talk instead of typing.

0/6 · they go into your PDF and stay on this computer

6

Floor Framing

Upper floors and suspended floors.

Tell me what you seeSign in to talk instead of typing.

Answer No and this part folds away.

7

Roof Framing

Trusses or rafters, their connections, and what has been done to them since they went up.

Tell me what you seeSign in to talk instead of typing.

Truss makers commonly allow very little out of plumb — often the truss depth divided by 50, up to 2 in. Check the truss drawings.

A cut truss needs an engineered repair letter from the truss maker before it is covered.

0/6 · they go into your PDF and stay on this computer

8

Services, Holes and Fireblocking

What the plumber, electrician and HVAC crew did to the frame.

Tell me what you seeSign in to talk instead of typing.

Under the IRC, bearing-wall studs may be notched up to a quarter of their width and bored up to 40% — the plans and your local code govern.

0/6 · they go into your PDF and stay on this computer

9

Safety and Housekeeping

Is the house safe and clean enough for the next trade to start?

Tell me what you seeSign in to talk instead of typing.
10

Result and Sign-Off

Can it be covered, what has to happen first, and who agreed.

Tell me what you seeSign in to talk instead of typing.
Corrective actions

Nothing added yet.

Optional: rate the framing crew on this house. These ratings are for your own records and are not part of the score.

0/10 · they go into your PDF and stay on this computer

Sign above — Inspector
Sign above — Framing contractor
Sign above — Construction manager

Free, no account needed. Your answers never leave this browser.

A framing inspection checklist is what a builder, site supervisor or owner's inspector works through before the frame disappears behind sheathing, insulation and drywall. It is the last cheap moment to find a wall out of plumb, a missing hold-down, a truss cut to clear a duct or a header sitting on one jack stud instead of two. This one walks the frame in the order you meet it — layout, walls, openings, bracing and tie-downs, floor, roof, services — marks every check Pass, Fail or N/A, asks what is wrong and where on every fail, and ends with a clear decision about whether the house can be covered. You can fill it in here and download a finished PDF without creating an account.

Your check, not the building department's

In most places the local building department carries out its own framing inspection before the walls are closed, usually after rough plumbing, electrical and mechanical are in. That inspection checks the frame against the code. This checklist is the builder's own quality walk — ideally done before the official one, so the inspector finds a frame that is already right.

Run it at two points if you can: a pre-sheathing walk while the bracing and tie-downs are still visible, and a pre-drywall walk once the trades have drilled their way through the frame. The stage question at the top records which one this is.

Inspect against the plans, not against memory

Write down the plan set and revision you are checking against, and carry the engineer's bracing and tie-down details and the truss layout with you. Most framing failures that matter are not workmanship in the ordinary sense — they are a hold-down left out, a bracing panel in the wrong place, a girder truss sitting on a single stud. Those are only visible if you know what the drawings ask for.

The tolerances in the hints are common reference points only. Your plans, the specification, the truss maker's installation guide and the engineer's details override them every time.

What gets missed most often

Experienced framing inspectors tend to find the same things again and again:

  • Point loads from girder trusses and beams with no solid studs or posts under them all the way to the foundation.
  • Hold-downs, straps and anchor bolts missing, or fitted without every fastener the manufacturer calls for.
  • Trusses cut, notched or drilled by another trade, or carrying an HVAC unit they were not designed for.
  • Studs and plates notched or bored past their limits for pipes and ducts, with no repair plate.
  • Fireblocking missing at floor and ceiling lines, soffits and around penetrations.
  • Headers with too few jack studs, or openings framed to the wrong rough size.

Fails, actions and the ready-to-cover decision

Every check marked Fail asks what is wrong and exactly where, so the framer can find it without calling you. Anything that needs a trade to come back goes in the corrective actions list with an owner and a date. Failed checks also appear in the report's summary of findings.

On the phone, Start a re-inspection turns every failed check into its own card — fixed, partly fixed, not fixed — with an after photo, and the follow-up report puts each one beside what you found the first time. Speak while you walk, and the document writes itself: say "east bedroom wall out of plumb, about half an inch" and the right check fills in.

Common questions

What is checked at a framing inspection?

The frame against the approved plans: wall layout and openings, plumb and straight walls, headers and their bearing, bracing, hold-downs and anchor bolts, floor joists and subfloor fastening, trusses or rafters and their connections, fireblocking, and the holes and notches the trades have made for services.

When should the framing inspection happen?

Before anything covers the frame. Many builders do a pre-sheathing walk to see bracing and tie-downs, then a pre-drywall walk after rough plumbing, electrical and HVAC are in. The building department's framing inspection usually comes at the pre-drywall stage.

Does this replace the city or county framing inspection?

No. This is the builder's or owner's own quality check. The building department's inspection is a separate, legally required step in most jurisdictions, and only the authority can sign it off.

How plumb does a framed wall need to be?

Whatever your plans or specification say. A common working allowance is around a quarter of an inch over eight feet; finish-sensitive walls such as tiled showers and cabinet runs often need better.

Can I use it for steel stud or panelized framing?

Yes. Record the framing system at the top. Most checks apply as written; mark anything that does not apply as N/A and it drops out of the score.

Can I re-check only the items that failed?

Yes. In the ReportWalk app, start a re-inspection from this walk and only the failed checks come back, each asking whether it is fixed, with a photo. Re-inspections are free.