Free for life: Get a Quote and Book Online buttons for your website. Create my widgets →Need a website? $25/mo or $500 once →
ReportWalk

Environmental

Phase 1 Environmental Site Assessment — Site Reconnaissance Checklist

A Phase 1 environmental site assessment checklist for the site reconnaissance: the property and how it is used, hazardous substances and petroleum products, storage tanks one by one, drums, stains and stressed vegetation, pits and ponds, drains and sumps, wells, septic systems, PCB equipment, fill and dumped waste, adjoining properties, interviews, what could not be seen, and every condition noted with a photo — ready for the environmental professional who writes the report.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

0 of 63 answered0%
1

Property and Assignment

Which property, for whom, why, and who walked it when.

Tell me what you seeSign in to talk instead of typing.
acres

The buyer, lender or developer relying on the report.

Name and role — owner, site manager, tenant.

Anything that hid the ground surface also goes under Limitations.

2

Property and Current Use

What is on the property today, and what it runs on.

Tell me what you seeSign in to talk instead of typing.

Who occupies which part, and what they make, store, repair or clean there.

How many, rough footprint, stories, apparent age, construction, basements.

Oil heat usually means a tank somewhere — find it and list it under Storage Tanks.

0/10 · they go into your PDF and stay on this computer

3

Signs of Past Use

What the property shows about what it used to be.

Tell me what you seeSign in to talk instead of typing.

Former orchards can mean old pesticide use — worth a note even though it is not flagged.

0/4 · they go into your PDF and stay on this computer

4

Hazardous Substances and Petroleum Products

What is used or stored, where, and whether any of it is getting out.

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions that follow fold away.

5

Storage Tanks

Every tank, above or below ground, and every sign of one.

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions that follow fold away.

6

Drums and Containers

Drums, totes and pails: what is in them, and are they sound?

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions that follow fold away.

7

Stains, Stressed Vegetation and Odors

What the ground, the plants and your nose tell you.

Tell me what you seeSign in to talk instead of typing.

Not ordinary oil drips in a parking space — staining that suggests repeated spills or a release.

0/6 · they go into your PDF and stay on this computer

8

Pits, Ponds and Lagoons

Any place on the property where liquid or waste has been held in the ground.

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions that follow fold away.

9

Drains, Sumps and Wastewater

Where liquids go when they leave the building or the yard.

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions that follow fold away.

10

Wells

Every well on the property, whatever it was for.

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions that follow fold away.

11

Septic Systems

On-site sewage disposal, and whether anything else went into it.

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions that follow fold away.

12

PCB-Containing Equipment

Transformers and other equipment old enough to contain PCBs.

Tell me what you seeSign in to talk instead of typing.

PCBs were widely used in electrical and hydraulic equipment made before the late 1970s. Answer No and the questions that follow fold away.

13

Solid Waste and Fill

What has been dumped, buried or brought onto the property.

Tell me what you seeSign in to talk instead of typing.

Dumpsters, a hauler, recycling, a hazardous waste contractor.

0/4 · they go into your PDF and stay on this computer

14

Adjoining Properties

What the neighbors do, seen from the boundary or public road.

Tell me what you seeSign in to talk instead of typing.
Adjoining properties

Nothing added yet.

Residential, mixed commercial, industrial park, farmland.

15

Interviews

What the people who know the property told you.

Tell me what you seeSign in to talk instead of typing.
People interviewed

Nothing added yet.

16

Limitations and Areas Not Seen

How you covered the property, and where you could not look.

Tell me what you seeSign in to talk instead of typing.

e.g. Walked the full boundary, crossed open ground on a rough grid, entered every building with the site manager.

17

Conditions Noted

Every possible environmental condition, in one list, for the environmental professional.

Tell me what you seeSign in to talk instead of typing.

List each thing you saw that might mean a release of hazardous substances or petroleum products, even if you have already ticked it above. Your classification is a field opinion — the environmental professional confirms or changes it in the report.

Conditions

Nothing added yet.

18

Summary and Sign-Off

A short summary for the report writer, and who did the walk.

Tell me what you seeSign in to talk instead of typing.

0/10 · they go into your PDF and stay on this computer

Sign above — Inspector
Sign above — Reviewer

Free, no account needed. Your answers never leave this browser.

A Phase 1 environmental site assessment is the due-diligence study done before a commercial property is bought, lent against or developed, to find out whether past or present use may have contaminated it. The site visit — the reconnaissance — is the part where someone walks the property and looks: at tanks and fill pipes, drums and stains, drains and sumps, wells, transformers, dead patches of grass, and what the neighbors do. This is the field checklist for that walk. It is not the Phase 1 report: the formal report, with the records review, the conclusions and the professional's declaration, is prepared by an environmental professional. What this form does is make sure the walk misses nothing and every observation arrives with its location and a photo. You can fill it in here and download a finished PDF without creating an account.

Where the site visit fits in a Phase 1

In the US, Phase 1 assessments are usually carried out to ASTM E1527-21, the industry practice used to meet the federal All Appropriate Inquiries rule. It has four working parts: a review of records (government databases, historical maps, aerial photos, directories), the site reconnaissance, interviews with owners, occupants and local officials, and the report that pulls them together. The site visit is the only part that cannot be done from a desk.

The reconnaissance is often done by a field scientist or technician working for the environmental professional, who then writes the report and signs the declaration. This checklist is built for that handover: it records what was seen, where, and what the person on the ground thought it might mean — and leaves the final call to the professional.

What to look for, and what counts

The goal is to find recognized environmental conditions, or RECs: signs that hazardous substances or petroleum products are, or may have been, released on the property. Some signs are obvious — a leaking drum, an oily sheen on a puddle. Most are not: a vent pipe against a wall with no tank in sight, a floor drain in an old auto shop that runs to who knows where, a rectangle of patched asphalt, a patch of ground where nothing grows.

Every question on this form that points to a possible REC is flagged, so it reaches the summary at the top of the report. The last section lists each condition you noted with a suspected classification — possible REC, controlled REC, historical REC, or likely de minimis — and the follow-up you would suggest. Those are field observations; the environmental professional decides what goes in the report as a finding.

Tanks, drums and drains: one entry each

Storage tanks, drains and transformers are lists on this form, because properties rarely have just one. For each tank, record where it is, whether it is above or below ground, what it holds, how big it is, whether it is still in use and what condition it is in. A fill port or vent pipe with no visible tank gets its own entry as a suspected underground tank — that is how most forgotten tanks are found.

For drains and sumps, the question that matters is where they go. A floor drain to the sanitary sewer is ordinary; one to a dry well, a septic system or nowhere anyone can tell you is a possible pathway into the ground, and the form flags it.

The neighbors, the interviews, and what you could not see

Contamination does not stop at the property line. Walk or drive the boundary and note what each adjoining property is used for — a gas station, dry cleaner, plating shop or old landfill next door is worth recording even if this property looks clean.

Talk to the people who know the site: the owner, the key site manager, long-standing tenants. Ask about tanks, spills, past uses, earlier environmental reports and any notices from regulators, and write down who said what. Then record the limits of the visit honestly — locked rooms, snow cover, a tenant who would not allow access, heavy vegetation. An area not seen is a data gap the report has to address, so the form flags it.

Speak while you walk, and the document writes itself: describe the fill pipe by the loading dock as you photograph it, and it lands as a tank entry with its location.

Common questions

Is this a Phase 1 environmental site assessment report?

No. This is the field checklist for the site reconnaissance — one of the four parts of a Phase 1. The formal report, including the records review, conclusions and the environmental professional's declaration, is prepared and signed by an environmental professional. This form records what the site visit found so that report can be written.

Who can perform a Phase 1 environmental site assessment?

In the US the assessment must be overseen by an environmental professional, as defined by the All Appropriate Inquiries rule — a person with a specific mix of education, licensing and experience. The site visit itself is often done by a trained member of their team working under their direction.

What is a recognized environmental condition (REC)?

The presence or likely presence of hazardous substances or petroleum products on a property because of a release, a likely release, or conditions that pose a material threat of one. A controlled REC is a past release addressed to a regulator's satisfaction but with controls still in place; a historical REC is a past release that was resolved without controls. Minor conditions that would not warrant action are de minimis.

How long is a Phase 1 good for?

Under ASTM E1527-21 a Phase 1 is generally viable for one year, but several parts — including the site visit and the interviews — must have been done within 180 days before the date the property is acquired, or updated.

What is the difference between a Phase 1 and a Phase 2?

A Phase 1 looks, reads and asks; it involves no sampling. If it identifies RECs, a Phase 2 may follow, collecting soil, groundwater, soil gas or building material samples to find out whether contamination is actually present and how much.

Does a Phase 1 cover asbestos, radon, lead paint or mold?

Not as part of the standard scope. They are often added on request as non-scope items. This checklist has a place to note any you noticed, so the environmental professional can decide whether to mention them.