Free for life: Get a Quote and Book Online buttons for your website. Create my widgets →Need a website? $25/mo or $500 once →
ReportWalk

Environmental

Stormwater (SWPPP) Inspection

A construction site stormwater inspection for the routine visit and the one after a storm: rainfall and discharges, the SWPPP and records, every control measure as its own entry with condition and repair needed, discharge points, entrances, slopes, inlets, stockpiles, washouts, dewatering and nearby waters — with corrective actions and the inspector's signature.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

0 of 66 answered0%
1

Site and Inspection

Which site, which permit, why you are inspecting, and the stage of the work.

Tell me what you seeSign in to talk instead of typing.
2

Rainfall and Discharges

What the weather has done since last time, and whether water is leaving.

Tell me what you seeSign in to talk instead of typing.

Sediment fans below an outfall, a stained ditch, debris lines on a fence.

Discharge points

Nothing added yet.

3

Plan and Records

The paperwork an authority inspector will ask to see first.

Tell me what you seeSign in to talk instead of typing.
4

Control Measures

Every BMP on the map, one entry each: where, what state, what it needs.

Tell me what you seeSign in to talk instead of typing.
Control measures (BMPs)*

Nothing added yet.

5

Entrances, Roads and Dust

Mud on the public road is the complaint that brings the inspector.

Tell me what you seeSign in to talk instead of typing.

Sweep, never wash it into the drain.

6

Perimeter, Slopes and Bare Ground

Stopping soil from moving in the first place.

Tell me what you seeSign in to talk instead of typing.

Temporary seeding, mulch, blankets or tackifier.

0/4 · they go into your PDF and stay on this computer

7

Inlets, Channels and Basins

Where water collects before it leaves.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

8

Stockpiles, Materials and Waste

Everything on site besides soil that rain can pick up.

Tell me what you seeSign in to talk instead of typing.
9

Dewatering

Pumped water from excavations and pits.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

10

Nearby Waters and Buffers

Streams, wetlands and ponds the site could reach.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

11

Corrective Actions and Certification

What must be fixed, by whom and when, and the inspector's signature.

Tell me what you seeSign in to talk instead of typing.

0/10 · they go into your PDF and stay on this computer

By signing, the inspector confirms the inspection was carried out as recorded here. If your permit requires its own certification statement, add it in the observations above.

Sign above — Inspector
Sign above — Operator

Free, no account needed. Your answers never leave this browser.

A stormwater inspection on a construction site checks that the erosion and sediment controls in the stormwater pollution prevention plan (SWPPP) are installed, working and maintained, and that muddy water, concrete washout and fuel are not leaving the site. This form covers the routine inspection and the one after a storm, records each control measure as its own entry with the repair it needs, and logs every discharge point. You can fill it in here and download a finished PDF without creating an account.

What a SWPPP inspection is for

In the US, most construction sites that disturb an acre or more need coverage under a construction stormwater permit — the EPA's Construction General Permit, or the state permit that replaces it. The permit requires a SWPPP, the controls it describes, and regular inspections by a qualified person, with records kept on site.

The point of the inspection is simple: find controls that have failed or filled up before the next rain, and fix them. A silt fence that is down, an inlet protection bag full to the top, or a construction entrance buried in mud does nothing during the storm that matters.

Outside the US the names change — an erosion and sediment control plan, an environmental management plan — but the walk is the same, and this form works for it.

How often, and after which storms

Your permit sets the schedule, and it is worth reading the clause rather than relying on memory. Under the EPA's Construction General Permit the common pattern is an inspection at least once every seven calendar days, or once every fourteen days plus within 24 hours of a storm producing a quarter of an inch (0.25 in) of rain or more. Many state permits use similar triggers; some are stricter, and sites discharging to sensitive waters often have to inspect more often.

Record the rainfall that triggered a post-storm inspection, and where it was measured — a rain gauge on site is better evidence than the nearest weather station.

One entry per control measure

A SWPPP site map shows dozens of individual controls: silt fence runs, fibre rolls, inlet protection at each drain, check dams, the construction entrance, the washout, sediment traps. "BMPs maintained — Yes" says nothing about which one is failing.

Here each control is its own entry with its map reference, its condition and, if it is not working, what needs doing and by when. That is also the shape of the corrective action record most permits ask for.

  • Working — doing its job, no maintenance needed.
  • Needs maintenance — sediment building up, a section sagging, a stake loose. Fix before the next rain.
  • Failed, overtopped or bypassed — water is going over, under or around it.
  • Missing — shown on the plan but not installed, or removed.

Where the water leaves

The inspection that matters most to a regulator is at the discharge points, because that is where pollution leaves the site. Walk to each outfall and look at what is flowing — clear, cloudy, brown, an oily sheen, foam — and at the receiving ditch, stream or drain below it. Photograph it. Muddy water leaving a site is the clearest sign that something upstream has failed, and the record you make that day is what shows you found it and acted.

Common questions

Who can carry out a SWPPP inspection?

A qualified person as the permit defines it — usually someone with training in erosion and sediment control who knows the site's plan. Some states require a specific certification. The inspector signs the report, and the permit usually names who must certify it.

What is a BMP?

A best management practice: any control measure used to prevent erosion or stop sediment and pollutants leaving the site — silt fence, fibre rolls, inlet protection, a stabilised entrance, seeding and mulch, sediment basins, concrete washouts and good housekeeping.

When should sediment be removed from a silt fence or trap?

Before it reduces the control's capacity to the point where it will fail. Common rules of thumb are when sediment reaches a third to a half of the fence height or of the trap's storage, but your permit or the manufacturer's guidance may set a specific figure.

How long do I have to fix a problem found during the inspection?

Your permit sets the deadline, and it is often short — the EPA permit generally expects work to start immediately and be completed within days, with a record of when. Put a fix-by date on every control that needs attention.

How long do stormwater inspection records need to be kept?

Usually for a set period after the permit is terminated — three years is common in US permits. Keep them with the SWPPP on site while the work is going on, so an inspector from the authority can see them.