A worksite traffic control audit that checks what is set out on the road against the approved traffic plan: advance signs, speed zones, tapers and delineation, traffic controllers or flaggers, portable signals and message boards, barriers, the end of the queue, pedestrians and cyclists, works vehicles and night work. Switch off what the site does not use.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

0 of 86 answered0%
1

Worksite and Plan

Where the works are, what plan they run to, and who is responsible.

Tell me what you seeSign in to talk instead of typing.

TGS or TCP in Australia, TTC plan in the US, traffic management plan elsewhere.

2

The Approved Plan

The paperwork — and whether the road matches it.

Tell me what you seeSign in to talk instead of typing.

Drive it first, then walk it with the plan in hand.

3

Advance Warning and Signs

Everything a driver reads before they reach the work.

Tell me what you seeSign in to talk instead of typing.

A "workers ahead" sign with nobody there teaches drivers to ignore the next one.

0/5 · they go into your PDF and stay on this computer

4

Reduced Speed Zone

A lower limit through the works, used only when it is needed.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

5

Tapers, Cones and Line Marking

The lines that steer traffic past the work.

Tell me what you seeSign in to talk instead of typing.

0/4 · they go into your PDF and stay on this computer

6

Traffic Controllers and Flaggers

The people standing on the road with a stop/slow bat.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

7

Portable Signals, Arrow Boards and Message Signs

The powered devices — approved, placed right, saying the right thing.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

Answer No and this whole section folds away. It is not counted in the score.

Answer No and this whole section folds away. It is not counted in the score.

8

Safety Barriers

What actually stops an errant vehicle reaching the work.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

9

End of Queue

Stopped traffic beyond the warning signs is where the worst crashes are.

Tell me what you seeSign in to talk instead of typing.
10

Pedestrians, Cyclists and Property Access

People on foot, on bikes, in wheelchairs — and the driveways along the site.

Tell me what you seeSign in to talk instead of typing.

0/3 · they go into your PDF and stay on this computer

11

Works Vehicles and Plant

Getting machines in and out without surprising the traffic.

Tell me what you seeSign in to talk instead of typing.
12

Night Work and Out of Hours

What the site looks like in headlights, and with nobody there.

Tell me what you seeSign in to talk instead of typing.

Answer No and this whole section folds away. It is not counted in the score.

13

Findings and Sign-Off

What was put right on the spot, what still needs doing, and who signed.

Tell me what you seeSign in to talk instead of typing.
Corrective actions

Nothing added yet.

0/10 · they go into your PDF and stay on this computer

Sign above — Auditor
Sign above — Site supervisor

Free, no account needed. Your answers never leave this browser.

A traffic control audit compares what is actually set out on the road with the approved traffic plan for the works — every sign, cone, taper, barrier and controller position — and checks that it still protects the workers, the drivers and the people walking past. This one is ordered the way a driver meets the site, switches off the parts your site does not use, and works under any regional manual. You can fill it in here and download a finished PDF without creating an account.

The plan on paper and the plan on the road

Every roadwork site of any size works to an approved plan — called a traffic guidance scheme or traffic control plan in Australia, a temporary traffic control plan under the MUTCD in the US, and laid out to Chapter 8 and the Safety at Street Works code in the UK. The plan is only as good as the set-out. Signs get knocked down, cones get moved to let a delivery in and never moved back, a lane closure grows by fifty metres without the taper following it.

So the audit starts with the plan: is there an approved one, is it on site, is it the right one for today's stage of work, and does what is on the road match it. Any change from the plan should be approved and marked up on it, not improvised.

Drive it, then walk it

Drive through the site in each direction at the posted speed before you get out of the vehicle. You will see what a driver sees: whether the first warning sign gives you time to react, whether the taper is clear at that speed, whether a crest or a bend hides the end of the queue. Then walk it with the plan in hand and check spacing, sizes and positions.

Do both by day and, if the site works or stays set out overnight, by night. Signs that look fine at noon can be invisible in headlights.

What this audit covers

The sections follow the order of approach, and each optional one switches off when it does not apply:

  • The plan, approvals and any road occupancy permit.
  • Advance warning signs and their condition, size, height and spacing.
  • Reduced speed zones — approved, signed, and lifted when work stops.
  • Tapers, cones, bollards and temporary line marking.
  • Traffic controllers or flaggers — numbers, tickets, positions, escape routes, communication.
  • Portable signals, arrow boards and variable message signs.
  • Safety barriers and their deflection zone.
  • The end of the queue, where most serious roadwork crashes happen.
  • Pedestrians, cyclists and property access.
  • Works vehicles, plant, deliveries and night work.

Regional rules, plain words

Distances, sign codes and qualification names differ by country and often by state. This form avoids manual clause numbers on purpose and asks whether each item meets the approved plan and the manual that applies to you — so the auditor's knowledge of the local standard does the work, and the record still reads clearly to the client, the road authority and the crew.

Common questions

Who can carry out a traffic control audit?

Someone trained in designing and inspecting traffic control for roadworks under the rules where the work is — in many Australian states, a person holding the relevant traffic management ticket; in the US, a person with work zone traffic control training; in the UK, a person trained to the street works and Chapter 8 standards. The road authority or the client often specifies who.

How often should traffic control be inspected?

A check when the set-out is first installed, at every change of stage, at the start of each shift, after dark if it stays out overnight, and periodically during long works. A formal audit like this one is often weekly or at milestones, with a quick daily check in between.

What is a taper?

The angled line of cones or bollards that moves traffic out of a closed lane or shifts it sideways. Its length depends on the speed of the road and the width of the shift; a taper that is too short forces drivers into a sudden swerve.

Why does the end of the queue matter so much?

Because drivers coming over a crest or round a bend at full speed meet stopped traffic they did not expect. The queue grows well beyond the site, so the warning has to move with it — extra signs, a protection vehicle, or adjusting stop times so the queue stays short.

Does this cover pedestrians and cyclists?

Yes. A roadwork site has to keep a safe, accessible route for people on foot — including wheelchairs and prams — and for cyclists, or provide a signed alternative. These are among the most often missed items in roadwork audits.