Free for life: Get a Quote and Book Online buttons for your website. Create my widgets →Need a website? $25/mo or $500 once →
ReportWalk

Construction

Weekly Site Safety Inspection

The weekly record of a construction site: the week's weather, trades and events, last week's open actions, then first aid and welfare, fire, security, PPE, housekeeping, falls, scaffolds, manual handling, tools, plant, ladders, electrical, hazardous substances, confined spaces and incident reporting. Skip what your site does not have — it will not count against your score.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

0 of 44 answered0%
1

Inspection Details

The site, the week, and who walked it.

Tell me what you seeSign in to talk instead of typing.

The person in charge on the day, not the name on the contract.

The whole week, not just this morning. A gusty Thursday is the reason to look harder at ties and sheeting.

This tells you which topics below matter most this week.

2

Since Last Week

Read the last one before you walk.

Tell me what you seeSign in to talk instead of typing.

An action open three weeks running is the headline of this report, whatever else you find.

3

First Aid and Welfare

The first ten minutes after somebody is hurt, and the basics every day.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

4

Fire and Emergency

Raising the alarm, getting out, and putting it out.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

5

Site Security and Public Protection

Keeping out those who should not be in, and keeping the public safe outside.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

6

Protective Equipment

What people are wearing today, counted rather than described.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

7

Housekeeping, Storage and Waste

The quickest read on how a site is being run.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

8

Access Routes, Edges and Openings

Trips on the level, and falls from edges and holes.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

9

Scaffolds

One entry per scaffold. The tag date is what gets missed.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

10

Manual Handling

Heavy, awkward and repetitive work — where most lost days come from.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

11

Hand and Power Tools

The right tool, in one piece, with its guard on.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

12

Plant and Machinery

Anything that can crush, cut or run someone over.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

13

Ladders and Stepladders

The most common single defect on any site.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

14

Electrical and Temporary Power

Temporary supplies, leads and isolation.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

15

Hazardous Substances

What is here, what it does, and who knows.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

16

Confined Spaces

Rare on most sites, and fatal when it goes wrong — often to the rescuer.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

17

Incident Reporting

Whether the site learns from what goes wrong.

Tell me what you seeSign in to talk instead of typing.

No hides this section. It will not count against your score.

18

Findings, Actions and Sign-Off

What has to change, who is doing it, and by when.

Tell me what you seeSign in to talk instead of typing.
Corrective actions

Nothing added yet.

Put it on the record. Crews read these, and a report that only lists faults stops being read.

0/10 · they go into your PDF and stay on this computer

Make it agree with the page above. "Good" beside two stop-work items discredits the whole report.

Sign above — Inspector
Sign above — Site manager

Free, no account needed. Your answers never leave this browser.

A weekly site safety inspection is the documented look at the whole construction site that sits between the daily pre-start checks and the monthly audit. It records what the week involved, confirms last week's actions were closed, and works through fifteen topics — from first aid and site security to scaffolds, confined spaces and incident reporting — skipping any your site does not have. You can fill it in here and download a finished PDF without creating an account.

Why weekly

Daily checks catch today's problems: the plant that fails its pre-start, the crew without eye protection. They are poor at catching drift — the guardrail taken out on Tuesday to land a pallet and never refitted, the fire point that has not moved since the frame went up three floors, the welfare cabin that ran out of hot water on Wednesday.

Seven days is also the rhythm several statutory inspections already keep. In the UK a scaffold used for work at height has to be inspected at least every seven days and after anything that could have affected it, such as a storm. The weekly inspection is not that inspection, but it is where you confirm those reports exist and are in date.

Look back before you walk

The first two sections are about the week, not the site in front of you: the weather since the last inspection, which trades are working, what happened, what changed, and whether last week's actions are closed.

That order is deliberate. A high wind on Thursday is the reason to look harder at scaffold ties and sheeting. A new trade on site is the reason to check its briefing happened. And an action that has now been open for three inspections running is the most important finding in this report, whatever else you find on the walk.

One entry per scaffold

Most weekly checklists ask whether scaffolds are inspected and let you answer once for the whole site. On a job with four scaffolds, a single Yes cannot tell anybody which one is out of date.

Here each scaffold is its own entry: where it is, what type it is, the date on its tag or report, and the handful of checks that actually find problems — boards, guardrails, ties, base and load. A failed entry is findable by the person who has to fix it.

  • Ties — trades take them out to get at the wall. Look wherever windows or cladding are going in.
  • Base — scaffold standards on bricks, blocks or offcuts instead of base plates and sole boards.
  • Boards — the gap left after someone borrowed a board for another lift.
  • Tag — read the date. A tag that is present but three weeks old is a No.

Skip what is not there

A fit-out in an existing building has no excavations and maybe no scaffold; a groundworks package has no drylining dust. Every topic after the first two starts with one routing question, and No hides it.

The routing question is never scored, and neither is anything behind it. Only the checks you actually answer count, so the percentage compares like with like from one week to the next.

What a finding needs

Something marked No only helps if somebody else can fix it without ringing you. That takes four things: what the defect is, exactly where it is, a named person, and a date. "Level 3, gridline C–D, toe board missing on the full bay, Dave (scaffold foreman), by Friday" is a finding. "Scaffold — No" is not.

Speak the finding as you stand in front of it, and the record writes itself. An hour later, back in the cabin, the gridline has already gone.

Common questions

How often should a construction site safety inspection be done?

Weekly is the common documented cycle for a whole-site inspection, alongside daily pre-use checks on plant and the statutory inspections that run on their own schedules — scaffolds, excavations, lifting equipment. Inspect again after anything that could have changed the site: a storm, an incident, a new phase of work.

Who should carry out the weekly inspection?

The site manager or another competent person with the authority to stop work. Rotating it with a safety representative or a trade supervisor now and then is worth doing — a fresh pair of eyes finds what the regular inspector has stopped seeing.

Does this replace the scaffold and excavation inspection reports?

No. Those are statutory inspections with their own forms, intervals and competence requirements. The weekly inspection checks that they happened, are in date, and match what is on site.

What should happen to items marked No?

Each one becomes an action with an owner and a date, in the findings list at the end. Next week's inspection starts by checking whether they were closed, which is why the form asks that question first.

How long should the records be kept?

At least for the life of the project, and longer where your contract, insurer or local rules require it. They are the evidence that the site was being looked at, and the closed actions are the half that protects you.

Is it too much for a small site?

Answer No to the topics a small job does not have and they disappear. A single-house extension might end up with eight topics, which is about right for a fifteen-minute weekly walk.