Free for life: Get a Quote and Book Online buttons for your website. Create my widgets →Need a website? $25/mo or $500 once →
ReportWalk

Facilities Management

Legionella Temperature Log

A monthly legionella temperature log for a UK building's hot and cold water system: the site and the thermometer used, calorifier flow and return temperatures, a list of sentinel and rotational outlets with the hot reading after a minute, the cold reading after two minutes and the mixed reading at TMV-fed outlets, each marked within the target your written scheme sets, little-used outlets flushed, quarterly shower head descaling, and actions for every reading that missed. Out-of-range readings are listed as findings. British spelling, UK practice.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

Assessing the whole water system rather than taking this month's readings? Start with the risk assessment: Legionella risk assessment

0 of 22 answered0%
1

Log Details

Which building, which month, who took the readings and with what.

Tell me what you seeSign in to talk instead of typing.

This log records the monthly checks your written scheme of control requires under ACoP L8 and HSG274. Use the targets and outlet list from that scheme; where the scheme differs from a hint here, the scheme wins.

A quick ice-water and boiling-water check, or a calibration certificate, depending on your procedure.

2

Calorifiers and Hot Water Heaters

What is leaving the hot water source, and what is coming back.

Tell me what you seeSign in to talk instead of typing.

Answer No for a site served only by instantaneous heaters or combination boilers, and this section folds away.

3

Outlet Temperatures

Every sentinel outlet, and this month's share of the rotational ones, with the number you read.

Tell me what you seeSign in to talk instead of typing.

Let the hot side run for one minute and the cold side for two before reading, with the probe held in the stream. Type the figure in °C — not just a tick — so next month can be compared with this one.

Outlets read

Nothing added yet.

Dripping taps, discoloured water, a smell, an outlet that could not be reached.

4

Little-Used Outlets

Outlets that sit idle, flushed as often as the scheme says.

Tell me what you seeSign in to talk instead of typing.

Answer No if nothing on this site sits idle, and this section folds away.

5

Shower Heads and Hoses

The descale and disinfect, when this round is the one it falls due in.

Tell me what you seeSign in to talk instead of typing.

Many schemes set this quarterly. Answer No in the months between, and this section folds away.

6

Out-of-Range Actions

For every reading that missed: what was done, the re-test, who owns it and by when.

Tell me what you seeSign in to talk instead of typing.

Answer No and this section folds away. Each outlet marked No above should have a line here.

7

Review and Sign-off

Signed by whoever took the readings, and reviewed by the responsible person.

Tell me what you seeSign in to talk instead of typing.

A line or two: how many outlets read, how many missed, anything that needs the responsible person's attention.

Sign above — Person taking readings

Signing shows the log has been reviewed, and any action above is in hand.

Sign above — Responsible person

Free, no account needed. Your answers never leave this browser.

A legionella temperature log is the monthly record that a building's water is being kept too hot or too cold for Legionella bacteria to thrive. Most written schemes of control in the UK ask for the same round each month: read the sentinel outlets nearest to and furthest from the hot water source and the cold tank, read a rotating sample of other outlets, check the calorifier, and flush anything that has not been used. This template records that round outlet by outlet, with the actual readings in °C, and turns every reading that missed its target into a finding with an action against it. Fill it in here and download the PDF without an account, or speak while you walk, and the document writes itself.

What the log is for

In the UK, the Health and Safety Executive's Approved Code of Practice L8 and its technical guidance HSG274 describe how a duty holder keeps legionella risk under control. The risk assessment identifies the risks; the written scheme sets out the checks that control them and how often; the log is the evidence that those checks were actually done. An inspector, an insurer or a client asking about water safety will usually want to see all three.

This form records the checks the written scheme requires. It does not replace the scheme or the assessment, and filling it in does not make a building compliant on its own — it shows what was measured, when, by whom, and what was done when a number was wrong.

Sentinel and rotational outlets

Sentinel outlets are the fixed points that tell you whether the whole system is behaving: on a hot water circuit, usually the outlets closest to and farthest from the calorifier or heater; on a cold system, the outlets closest to and farthest from the storage tank or incoming main. They are read every month. Rotational outlets are the rest, read a few at a time so that every outlet in the building gets looked at over a cycle the scheme sets.

Outlets go into this form as a list. Give each one the reference used on the scheme's drawing or asset register, so next month's reading lines up with this month's.

Taking a reading

Run the hot side for a minute and the cold side for two, then hold the probe in the running water and record the figure. Write the number down rather than a tick — a reading that is creeping towards its limit is only visible if the numbers are there to compare.

Where an outlet is fed through a thermostatic mixing valve (TMV), the mixed water is meant to sit below the temperature that protects against legionella, to protect people from scalding. Record the mixed reading separately, and note that the TMV itself usually has its own servicing routine.

When a reading misses

Mark the outlet as not within target and the form opens an action for it: what you did on the spot, the re-test reading, who owns the next step and by when. Flushing and re-testing often settles it; a hot outlet that stays cool, or a cold outlet that stays warm, usually points to something in the system — a failing pump, a valve, a calorifier set too low, pipework running through a warm space — and should go to the responsible person named in the scheme.

Common questions

How often should legionella temperature checks be done?

Most written schemes ask for sentinel outlets to be read monthly, with other outlets read on a rotation and calorifiers checked at a set interval. Follow the frequencies in your own written scheme, which your risk assessment should have set for that building.

What temperatures should the outlets reach?

Use the targets in your written scheme. Commonly cited figures are hot water reaching at least 50 °C within a minute (55 °C in healthcare settings) and cold water below 20 °C within two minutes, with calorifiers commonly storing at 60 °C and returning at 50 °C or above. Mixed water from a TMV is set lower, to a range chosen for the people using it.

What is a sentinel outlet?

A fixed outlet chosen because it shows how the whole circuit is behaving — usually the first and last on a hot or cold run. If the sentinels are within target, the outlets between them are likely to be too.

Who can take the readings?

Anyone the duty holder has trained to do it and named in the written scheme — often a caretaker, site manager or water hygiene contractor. The responsible person should review the log and act on anything out of range.

Is this an official HSE form?

No. HSE does not issue a standard log. This template records the readings and actions a written scheme typically asks for, in a form you can keep, compare month to month and hand over when asked.