Free for life: Get a Quote and Book Online buttons for your website. Create my widgets →Need a website? $25/mo or $500 once →
ReportWalk

Arboriculture

Tree Protection Inspection

A scored tree protection inspection for construction sites: the project, phase and plan reference, each protected tree with the agreed protection distance and the measured fence distance, fencing and signs, nothing stored, parked, dumped or washed out inside the zones, no grade changes, digging and root pruning done with the arborist present, mulch, water and ground protection, damage found with photos, instructions to the contractor with an urgency, the next visit, and signatures from the arborist and the site superintendent.

Free — no account, no trial, no card.

Fill this in and download the finished PDF. Your answers stay on this device as you type. We ask for an email address once, at the download.

When the building is done and new trees go in, check the stock, the depth and the mulch with: Tree planting inspection

0 of 40 answered0%
1

Project and Visit

Which job, what stage it is at, and why you are here.

Tell me what you seeSign in to talk instead of typing.

Type them as they appear on your cards. Nothing here checks or vouches for them.

2

Protected Trees

Each tree being kept: the distance agreed, the distance measured, and how it looks.

Tell me what you seeSign in to talk instead of typing.
Protected trees*

Nothing added yet.

3

Fencing and Signs

The barrier itself, and whether everyone knows what it is for.

Tell me what you seeSign in to talk instead of typing.

Plans usually ask for posts driven in and mesh or chain-link that a crew cannot simply step over or move.

Facing the work, readable from a machine, and in the languages the crews speak.

0/6 · they go into your PDF and stay on this computer

4

Inside the Protection Zones

Nothing that compacts, poisons or buries the roots.

Tell me what you seeSign in to talk instead of typing.

Even a few inches of fill over the roots can suffocate them; stripping topsoil takes the feeding roots with it.

Mats, plywood over a thick chip layer, or what the plan names. Mark N/A where no access was allowed.

0/6 · they go into your PDF and stay on this computer

5

Digging and Root Work

Only on visits where digging or grading came near a protected tree.

Tell me what you seeSign in to talk instead of typing.

Answer No and the questions about it fold away.

6

Tree Care During Construction

What keeps the protected trees healthy while the work goes on.

Tell me what you seeSign in to talk instead of typing.

Mark N/A if the plan does not call for watering.

Many specifications cite ANSI A300. Mark N/A when no pruning was done.

7

Damage Found

Anything that has already happened to a tree, with a photo.

Tell me what you seeSign in to talk instead of typing.
Damage found

Leave empty when nothing was found.

Nothing added yet.

8

Instructions and Sign-Off

What the contractor must do, by when, and who saw this report.

Tell me what you seeSign in to talk instead of typing.
Instructions to the contractor

Nothing added yet.

Sign above — Arborist
Sign above — Superintendent

Free, no account needed. Your answers never leave this browser.

A tree protection inspection is a site visit by an arborist to check that the trees a construction project promised to keep are being kept: fenced at the agreed distance, signed, and free of the soil, trucks, washout and trenches that kill trees slowly. Most of the damage that kills a tree on a building site happens underground and shows up two or three years later, which is why the visits matter and why the record of each one matters. This checklist scores what you see on the day and turns every failure into a finding with an instruction. Fill it in here and download a PDF without an account, or speak while you walk, and the document writes itself.

The fence is the whole game

Roots spread far beyond the trunk, and the fine roots that take up water live in the top foot of soil. Driving a loaded truck over them once can compact the ground enough to starve them. A sturdy fence around a protection zone keeps traffic, storage and digging out, and nothing else works as well.

The distance is set in the project's tree protection plan or by the local ordinance, often based on trunk diameter. This form does not suggest one. It asks you to type the agreed distance for each tree and the distance you actually measured, so a fence that has crept inward over the weeks is plain to see.

What happens inside the zone

The checks walk the usual offenders: stockpiled materials and spoil, parked equipment and pickups, concrete and paint washout, fuel, soil piled against trunks, signs nailed to bark, and new trenches. Ground protection such as mats or a thick layer of wood chips counts only where the plan allowed access through a zone; where it did not, the check is N/A.

Root work with the arborist present

When a utility trench or a footing has to come near a protected tree, the plan usually calls for the arborist to be there: digging by hand or with air, cutting roots cleanly rather than tearing them with a bucket, and covering exposed roots so they do not dry out. Those checks only appear when there was digging near a zone since the last visit, so a quiet week is not marked down.

Any pruning for clearance should be done by an arborist to the job's specification; ANSI A300 is the US standard most specifications refer to.

Instructions, not just observations

Each visit ends with instructions to the contractor: what to fix, who should fix it and how soon. An instruction marked "stop work near this tree" shows up as a safety finding at the top of the report, and the next visit can check it was done.

Common questions

What is a tree protection zone?

It is the area around a tree that is fenced off during construction to protect the trunk, the crown and especially the roots. Its size is set by the project's tree protection plan or by local rules, often as a multiple of the trunk diameter, and it is usually larger than the dripline people expect.

How often should an arborist inspect tree protection?

Many plans call for a visit before work starts to approve the fencing, then regular visits — often monthly — plus a visit whenever digging, grading or utility work comes near a protected tree, and a final visit at the end. Your permit conditions or the plan may set a schedule.

What damages trees on construction sites?

Soil compaction from vehicles and storage, roots cut by trenches and footings, grade changes that bury or strip the root zone, chemical spills and concrete washout, and wounds to trunks and limbs from equipment. Most of it is invisible at first and shows up as decline years later.

Is this form the official city inspection?

No. It records the arborist's site visit. Many cities have their own tree protection inspections and forms; this one gives the project a clear record of each visit that can be attached to whatever the city asks for.

How is the score calculated?

Each Pass/Fail check that applies counts once, each protected tree's fence-distance check counts once, and N/A answers are left out. The score is the share of checks passed. A missing fence or digging in a zone is always a finding, even if the score looks good.